4 BEDROOM HOUSE REFURBISHMENT

  • Full rip out.

  • New plumbing

  • New rewire

  • Full plastering

  • Removal of non load bearing wall to open space

  • Install new kitchen

  • Install new tiled floor

  • install new wooden floor and skirting

  • install new stairs and safety grooves.

  • PaintinG

  • Create new porch.

  • install new front door.

  • snagging and silicone

Previous
Previous

London Bridge

Next
Next

Brighton